The customer

New Zealand’s largest thermal power station is operated by Genesis Power, in Huntly. It generates 1,000 megawatts of electricity from coal and gas.


The power plant had operated four separate radio systems and coverage had been poor because of the types of buildings on site.


A single TaitNet TN1100 site is now providing coverage around the 175 acre plant, along a 1.8 mile overland coal conveyer, and to ash ponds north of the plant.

Twenty-six Intrinsically Safe Tait portables are used on the system along with five Tait mobiles. One of the mobiles features dual control-heads, enabling staff on opposite sides of a control desk to operate it easily.

Two T1810 channel controllers (each capable of managing four channels) provide the system intelligence. The business may implement telephone interconnection in the future, which is possible with the TN1100. 


The new system allows the five different work-groups at the plant to communicate with each other and features an emergency-call option.

The old systems were voice only, while the new system provides data and PABX features as well as backup power and duplicated audio linking.

Tait and Genesis are also looking at extending the radio coverage to areas like the underground power-cable tunnels at the plant and the TN1100 system to support future expansion.

Download Case Study as a PDF - 140 KB

Other case studies

ActewAGL, ACT, Australia

ActewAGL, Australia’s first multi-utility, offers electricity, natural gas, water and wastewater services under one roof.

Read client story

Companhia Paranaense de Energia (COPEL), Brazil

COPEL is responsible for the provision of uninterrupted power service to over 3.8 million consumers.

Read client story

White Paper

Introducing Unified Critical Communications for Public Safety

Learn how a unified critical communications approach can work, and how it can increase end user productivity, improve resilience and reduce costs.